1 create another named ref plane in plan view so as to draw the roof profile roughly at end of roof image 1 2.
Revit set roof to reference plan.
If i change the cut in the view range to go lower it shows the cavity wall outline but cuts the roof.
I ve attached an image as to how far i ve got.
Here i am using 2 reference planes to control the start and end of the roof extrusion.
Do the roof first create a reference plane that is aligned and locked to the roof then set a view that is perpendicular to that reference plane and use that to sketch the beam system.
This method is worth learning so when plane moves everything goes with it.
Cut plan keep above roof level.
There doesn t seem to be a way in the tag properties to reassign the elevation tag level reference.
Revit displays the modify linework contextual ribbon.
Click architecture tabbuild panelroof drop down roof by footprint.
Capture other features modelled below.
This makes the roof line visible in the plan view but the lines appear as solid lines.
That is the vertical reference planes on the left and right hand side of the image.
As you can see i have my roof outline over a wall outline but no cavity lines in the wall.
Select the linework tool in the view panel on the home ribbon.
If you try to add a roof on the lowest level a dialog prompts you to move it to a higher level.
In the drawing area draw the reference planes by dragging the cursor.
Click on each roof edge line to change the linetype.
In this image we are looking down plan view on to the top of an extruded roof i ll show you how to create these later on in the course.
I have a situation where a new revit user unknowingly placed an elevation tag callout on the roof level verses the floor level.
Add a roof using one of the following methods.
Take the above example.
Select the desired linetype from the line style type selector.
If you choose not to move the roof to a different level revit notifies you later if the.
Keeping lower than that might.
Bottom and view depth just below roof level or roof level itself.
On the draw panel click line.
Of course when they latter opened the floor plan they couldn t find the elevation tag.
Now if the slope of the roof changes the reference plane will folow the slope and the beam system will follow the reference plane.
If they hadn t spent so much time creating the elevations i would just have them.
Once you get the roof plan view range adjusted hide wall and any other categories like furniture plumbing etc in.
I m trying to currently show the cavity wall outline only with my roof outline overlaid as such.
Sketch a roof by footprint display a floor plan view or a reflected ceiling plan view.
Create tab datum panel reference plane conceptual design environment.
And remove underlay if there is any.